Project Type
Repair of critical laundry ventilation infrastructure
Problem
St. Vincent’s Private Hospital faced a significant issue with their laundry facility’s ventilation system. The ducts were not clearing properly, resulting in poor airflow and ineffective ventilation.
The situation was further complicated by compromised insulation due to lint buildup, which not only affected system performance but also posed a risk of operational inefficiency. Prompt repairs were essential to avoid disruptions and ensure the laundry operations remained smooth.
The situation was further complicated by compromised insulation due to lint buildup, which not only affected system performance but also posed a risk of operational inefficiency. Prompt repairs were essential to avoid disruptions and ensure the laundry operations remained smooth.
Challenges
Addressing the problem required a careful approach. The repairs and installation had to be performed outside normal business hours to minimize noise and prevent any disruption to the hospital’s crucial activities.
Additionally, the use of hot-works was prohibited due to the flammability of materials in the ducts, necessitating an alternative method to ensure safety while completing the job efficiently.
Additionally, the use of hot-works was prohibited due to the flammability of materials in the ducts, necessitating an alternative method to ensure safety while completing the job efficiently.
Solution
Criticool Services rose to the challenge with a tailored solution. They expertly installed a total of 52 access panels, choosing a mix of curved and square panels to suit both spiral and rectangular duct configurations. This installation significantly improved future maintenance access.
In addition, the team repaired and replaced the insulation throughout the system, addressing the lint-related issues and enhancing overall performance. By scheduling the work during off-peak hours and avoiding hot-works, Criticool Services ensured that the repairs were completed with minimal disruption and maximum safety.
As a result, the laundry facility’s ventilation system was restored to peak efficiency, supporting the hospital’s operational needs and solidifying Criticool Services’ reputation for reliable HVAC-R solutions.
In addition, the team repaired and replaced the insulation throughout the system, addressing the lint-related issues and enhancing overall performance. By scheduling the work during off-peak hours and avoiding hot-works, Criticool Services ensured that the repairs were completed with minimal disruption and maximum safety.
As a result, the laundry facility’s ventilation system was restored to peak efficiency, supporting the hospital’s operational needs and solidifying Criticool Services’ reputation for reliable HVAC-R solutions.